Download the Climate Action Plan

The MVC Makes Progress on Land Use Projects

A few updates from the Martha’s Vineyard Commission (MVC) on various Land Use projects and initiatives:

  • MVC has drafted a MVC DRI Policy for flood risk areas
  • MVC completed a Sengekontacket salt marsh migration study that mapped the marsh migration zone and all structures and septic systems within the zone
  • Vineyard Vision Fellow, Maggie Craig, and the MVC began a study of the local production and applications of biochar, the environmentally beneficial material left over after charring wood in a controlled environment.